RESOLUTION NO. R-035-2024 NOTICE TO CONTRACTORS
PUBLIC NOTICE
RESOLUTION NO. R-035-2024
NOTICE TO CONTRACTORS
County of Adams
Department of Public Works
Ritzville, Washington
Fiber To The Home – Phase #1 – Ritzville/Lind Project
Sealed bids will be received by Adams County at the office of the Board of County Commissioners located in the courthouse at 210 W. Broadway, Ritzville, Washington 99169, until 1:30 p.m., Tuesday, August 27, 2024, and will be opened and publicly read on August 27, 2024, at 1:30 p.m., or as soon thereafter as possible, for the following construction improvements:
Installation of a Fiber Optic line to the home within the City of Ritzville, Town of Lind and a middle mile trunk line, by installation of ariel fiber line, underground fiber line, co-location cabinets and buildings by overhead work, underground plowing and open trenching and other work, all in accordance with the Contract Plans, these Contract Provisions and the Standard Specifications. The work on this project includes, but is not limited to the following:
• Furnishing all labor, equipment and materials (unless otherwise noted) necessary for the construction of the project.
• Completing and complying with all permitting as required
• Production of as-builts
Maps, plans, specifications, and proposals may be obtained from the office of the Department of Public Works, 210 W. Alder, Ritzville, Washington, 99169; phone (509) 659-3276 or by referring to the link below for access to the invitation to bid.
https://drive.google.com/drive/folders/1jjOJObY1ehec_eMXzQggkY2OOaLfw9yT?usp=drive_link
Informational copies of maps, plans and specifications are on file for inspection in the office of the Adams County Department of Public Works at 210 West Alder, Ritzville, Washington, and the chapter office of the Associated General Contractors of America in Spokane, Washington. All questions should be directed to Todd O’Brien or Troy Reynolds at (509) 659-3276.
All bid proposals shall be accompanied by a bid proposal deposit in cash, certified check, cashier's check or surety bond in amount equal to five percent (5%) of the amount of such bid proposal. Should the successful bidder fail to enter into such a contract and furnish satisfactory performance bond within the time stated in the specifications, the bid proposal deposit shall be forfeited to the County of Adams. All checks and bonds shall be made payable to the Adams County Treasurer.
The Board of Adams County Commissioners reserves the right to reject any or all bids, to waive informalities or irregularities in the bids or in the bidding, if the best interest of Adams County will be served, or to accept the bid, which in their opinion best serves the interest of Adams County. Bidders must meet the criteria in RCW 39.04.350.
All contractors must be licensed in the State of Washington to conduct business.
• This is project has a requirement that state prevailing wages must be paid
• All work performed on this project will be subject to Washington State prevailing wages rates
• The County of Adams is an Equal Opportunity and Affirmative Action Employer
• This project is funded/partially funded, by federal award number SLRFP0002 (ARPA SLFRF) awarded to Washington State Broad Band Office by the U.S. Department of the Treasury.
“The Adams County, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award”.
DATED this 23rd of July 2024.
BOARD OF COUNTY COMMISSIONERS
ADAMS COUNTY, WASHINGTON
Dan C. Blankenship, Chairman
Miguel A. Garza, Vice-Chairman
Jay R. Weise, Commissioner
ATTEST:
Patricia J. Phillips, CMC
Clerk of the Board
Published July 31 and August 7, 2024